Building and project description:
Project Timing:
Building accessibility:
As Built Services Requested:
|
FLOOR PLANS - (including walls, windows, doors, openings, columns, HVAC units, water heaters, plumbing fixtures and built-in cabinetry) |
|
FLOOR PLAN WITH MEP - (locate all visible mechanical, electrical elements that are without obstruction) |
|
RCP - (reflected ceiling plan (document all ceiling heights and transitions) |
|
RCP WITH MEP - (reflected ceiling plan (THAT ARE VISIBLE) document all heights and transitions as well as all MEP items on the ceiling) |
|
ROOF PLAN (Napco not responsible for aerial lifts, etc. Assume Standard Access) |
|
Interior elevations |
|
Sections |
|
Exterior Elevations |
|
MEP - (locate visible switches, data outlets, receptacles, fixtures, smoke detectors, vents, alarm pulls, emergency lighting, lighted exit signs etc. on walls and floor) |
|
Ground Penetrating Radar to locate utilities. |
|
360 SPHERICAL TOUR (virtual walk through of space) |
|
Concrete Scans to detect rebar and tension cables in concrete |
|
VizBuilt 360 Walk through |
|
Drone Photos |
|
Drone Video |
|
SITE PLAN - (without boundary information) (extends approximately 50' beyond building envelope unless otherwise requested) |
|
OTHER - (please describe your requested services in the additional services box below) |